Store decoration construction process
0000-00-00 00:00:00
The construction process of
storefront renovation
The 1 approach, wall, wall.
2 cut line groove, water and electricity transformation and acceptance.
3 hydropower renovation project hidden buried slot.
4 carpentry approach, hanging ceiling, gypsum corner.
5 package door, window cover, making wooden cabinet frame.
6 synchronous production of all kinds of wooden doors, plastic doors and flat pressure.
7 wooden panel brush dustproof paint (oil).
8 window laying marble table leveling.
9 wood trim panel paste, line production and fine installation.
10 metope processing, grinding, leveling.
11 furniture, door seam adhesive (protection).
12 wall oil ICI at least three times.
13 furniture paint approach, eye patch, paint.
The 14 corner, laying tiles, wood or composite wood floors, marble waterproof, skirting board.
15 lamps, sanitary ware, handle, door lock installation and commissioning.
16 cleaning, floor tile repair, remove the field.
17 interior decoration company preliminary inspection.
Three 18 party booking time, delivery of the owners.